MAXXPWR EMS · Energy Dashboard
admin · full control | viewer · read-only
Made by inoiTECH
← EMS EMS
Data unknown Alarm status unknown Kafka transport --:--

Menu

EMS

EMS overview Energy settings BESS controls

EV

EV chargers Inventory

Reports

Energy reports ERE

Market

Market operations

Admin

Site settings Users

Account

Account · click to change password

No access to this installation. Choose an allowed location.

Outside

—
—°C
Wind—
Humidity—
PV forecastfavourable

Grid Energy

import
—kWunknown
Exported today—
Imported today—
Tariff—

Solar

OK
—kW
Peak capacity—
Yield today—

EV

LIVE
—kW
Site EV meter—

Local usage

— kW
—kW
Site AC load—

Calculated from Grid, Solar, BESS and EV meters when no dedicated load meter is commissioned.

BESS

standby
Data unknown
State of Charge (SOC)
—%
Power (BESS)—
Own use—
Remaining energy—
Cell temperature—
State of Health (SoH)—
BMS charge / discharge limit—
Commanded No command
Controller —
Plant actual —
Measurement source unavailable

Energy Flow

real-time kW

EV overview

Connector status and availability: unknown.

BESS controls

Bedieningsdoel: No installation selected

OFF OFF
—

Manual · Both stacks (system total). Per-PCS control is not available.

Setpoint kW
SOC restrictions (this installation · all stacks)
% %

EMS stops charge at max / discharge at min per stack; the other stack may continue.

EMS Optimizer 12 h back · now · 12 h ahead · kW

advisory
Now—
Spot—
PV fc—
BESS plan—
Grid plan—
€ vs naive—

Plan only. Solar-first still owns live BESS writes. Live optimizer control stays off.

Price Forecast day-ahead €/kWh

—
Now—
Next—
Min 24 h—
Max 24 h—

Eddy Grid uses EnergyZero day-ahead wholesale excl. VAT.

Hourly Energy last 24 h · kWh

Above 0 = production & Grid export · below 0 = usage, charge & Grid import. Click an hour for per-minute kW.

EV Chargers

— kW
Site DLM limit 240 kW

EV import guard Nidec · grid import limit

—

—

Events

last 40

Energy reports

Operational totals from the existing report API. Task 10b (durable store, PDF, retention, data-quality rules) is not in this page.

Grid import PV production EV charging

EV sessions

recent OCPP

Showing at most the newest 80 OCPP events kept for this site. This is not the full session history. Missing kWh stays blank.

TimeStationGunEventkWhSource

Market operations

Shadow view for this site. Nothing here writes to the battery or the chargers. Open one area at a time.

Recent decisions

Site contract

These values are the contract and control settings for the site selected in the top bar. Each save stores a new version with your reason.

ERE Registration

MID CDR evidence per site/EAN · external inboeker first

Only integrated-MID session records are claim evidence. Energy Reports, Kafka site-meter totals and power × time remain operational reconciliation.
Site registration

Calendar-year route

Integrated MID meters

Map exactly one authoritative OCPP or Modbus source per physical gun.
Period evidence
StoppedGun / meterMID kWhStatusBatchCorrection

Frozen batches

OCPP chargers

Add a location, then Add charger on that location. Aliases belong to the same physical charger. Registration does not send a charger command.

Modbus chargers

Save updates the host or port for this site. Port 502 is the Modbus TCP default. Live polling uses the saved address when EV Modbus is enabled.

EV Fleet & Auto-charge

Authorized credentials

Deny-by-default for unknown idTags. Register RFID cards or Autocharge vehicle MACs (12-hex / AUTO_…). Commissioned vehicles stay on the list after redeploy.

User Management

Change password

Energy settings

Strategy & electricity contract

The fixed rate is used exactly as entered. Dynamic costs use the verified supplier tariff when available; otherwise prices are clearly marked PROXY.

Charging limits

Site demand is served first. Hardware, grid and individual stack SOC limits always apply. Efficiency is a planning estimate.

Recurring SOC targets

Each target applies to every commissioned stack. Select the days on which the battery must be ready. A start time at or after the ready-by time starts on the previous day.

During a target window, the strategy charges or holds the battery. Outside the target window, Live holds standby. Telemetry for this strategy is Modbus only. Manual commands require Energy settings Off.

Next target · saved plan
Decision journal

Latest 200 settings, planning and command records are retained per installation. A command acknowledgement is separate from measured plant power.

Site settings

Name, location and PV array for forecasts. Saved per site in the dropdown.

PV array

Compass azimuth: 0° north · 90° east · 180° south · 270° west

Global optimizer

Resets learning for the global optimizer. Not restricted to the selected site.

Add installation

Creates a new site in the top-bar list and in OCPP → Add location. It does not connect Modbus or Kafka until those are configured separately.

MAXXPWR® Energy Systems simulator Made by inoiTECH